Banimmo
Description:
Total air sealing project: The air sealing of floor-wall, ceiling-wall and the connection of concrete columns were carried out along the inside.
Result Blower door test: n50 < 0.2 m³/h ( Passive office building )
Used products:
Blowerproof Liquid and Blowerproof Liquid Brush coatings.
Realised by:
Approved installer UK:
chris@spiperformancecoatings.com
call direct: 07949535375
Mopes Ln, Purton, Swindon SN5 4HG
Approved Installer Ireland:
Contact:
Feargal Driver
Call direct: 087 659 0000
2 Charvey Ln, Commons, Rathnew, Co. Wicklow
.jpeg)
.jpeg)

