AZ Groeninghe New Hospital
Description:
Air sealing works: Blowerproof coating was applied to the floor/wall connection of the curtain walls. The substrate to which Blowerproof was applied was rockwool insulation.
Used products:
Blowerproof Liquid and Blowerproof Liquid Brush coatings.
Realised by:
Approved installer UK:
chris@spiperformancecoatings.com
call direct: 07949535375
Mopes Ln, Purton, Swindon SN5 4HG
Approved Installer Ireland:
Contact:
Feargal Driver
Call direct: 087 659 0000
2 Charvey Ln, Commons, Rathnew, Co. Wicklow



