Projecttype: for private houses and small scale projects;
The floor to wall junctions on all floorlevels need to be made airtight. Apply Blowerproof coating before the floor insulation and screed is done, and before the inside wall finish is applied.
Application method (as in video)
Ensure dustfree surface
Fill holes and joints bigger than 5mm with polyurethane foam or a fast setting cement based product.
Apply Blowerproof Liquid Brush in two layers with a flat paintbrush. Total consumption min. 0,6 kg/m².
The floor to wall junctions on all floorlevels need to be made airtight. Apply Blowerproof coating before the floor insulation and screed is done, and before the inside wall finish is applied.
Application method:
Ensure dustfree surface
Fill holes and joints bigger than 5mm with polyurethane foam or a fast setting cement based product. Apply the brush version of Blowerproof for holes and joints of 2 - 5 mm.
Apply Blowerproof Liquid in two layers with an airless paintspray device. Total consumption min. 0,6 kg/m².
Blowerproof maakt gebruik van cookies voor een betere gebruikservaring.
Door op 'OK' te klikken of door verder te surfen op deze website geeft u de toestemming aan Blowerproof om cookies
te gebruiken. Klik op 'Meer' voor als u meer wil weten over cookies, of u wilt uw cookie-instellingen voor deze website aanpassen.